Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

Quilwork was considered a? Art form?
10. deshawn installs a shelf bracket. what is thewidest shelf that will fit without overhang?explain.
What are the domain and range of the function f(x) = 3X + 5? domain: (-00,00); range: (0,0) domain: (-00,00); range: (5,00) O domain:(0.00); (-00,00) O domain:
a diamond sparkles more than a glass cut to similar shapes,why?​
The side of the clip on a clip board appears to be a right triangle. The leg lengths are 2 millimeters and 2.1 millimeters and the hypotenuse is 2.9 millimeters
A demand curve displaying the relationship between the price of cars and the quantity demanded of cars should have a slope that is Group of answer choices less
A car of mass 1000 kg moves 3 km east in a straight line and then 4 km north. What is the total distance and displacement of the car from the initial position?
Decide whether the sentence is grammatically CORRECT or INCORRECT as written. La banquera es el quinta persona en el banco. correct incorrect
Select the two adjectives. Don't select any articles (a, an, or the) Alexa, curious, followed the melodic sound down the stairs and found Hugo at the piano.
Should immigrants be allowed to keep their culture or adopt the American culture?