leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

Can you recommend the best Indo Chinese restaurant in Heathcote Valley?
Match each prefix with its definition.Match Term DefinitionAnti A) PartlyMulti B) AgainstSemi C) Many
Contact lenses 1. should/shouldn't be worn.
22. A bag contains 20 red, 40 blue and 15 yellow balls. Find the percentage of red balls. (A) 24 2/3% (B) 26% (C 25 2/3 % (D) 26 2/3%
What is the ideology that believes in essential differences and a natural hierarchy between different so-called races of people?A. RacismB. MulticulturalismC. E
I am a grade 9 student currently studying biology, chemistry and more as my electives. \ desire to be a doctor and is amazed by the human body and structures of
Subject verb agreement “either the car or the cyclist _____ responsible for the accident”
Which set of angle measures could be the measures of the interior angles of a triangle? a. 90°, 42°, and 58° b. 60°, 60°, and 60° c. 100°, 48°, and 42°d. 31°, 7
54321 code in english language​
I NEED HELPPO NOWWW PLEASEEE!!