reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

What is the meaning of open proportion?
Suppose that a rectangle has a perimeter of 24 meters. Express the area A(x) of the rectangle in terms of the length x of one of its sides. A(x) = ??
Suppose that a rectangle has a perimeter of 24 meters. Express the area A(x) of the rectangle in terms of the length x of one of its sides. A(x) = ??
Express 230 in scientific notation
What is 258/300 written as a decimal and a percent???
tanisha ran 3/5 of a 26 mile race in 3.2 hours.if she ran at a constant rate,what was her speed in miles per hour?
If five slices of pizza cost $5.50, how much do two slices cost? Ten slices? Half a slice ?
what is the proper or common noun in this sentence?The picture below is of the snow Festival in Sapporo.
Solve the equation for y.4x – 5y = 9
1) fought at Lexington and Concord 2)a formal meeting called for a special purpose 3) complaints against British rule 4) formed to solve the problem of trade