adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

how did new ideas affect europeans views of the world
A teacher gives her students diffraction gratings. When the students look through the diffraction gratings up at the lights, the white light is separated into s
A jar has one red, one green, one yellow, and one blue marble. You pick one marble, keep it, and pick another marble until all four marbles are chosen. What is
Briefly explain the significance of ONE historical event from the 1970’s.
What's inscribed on the "walls” of the Vietnam Veterans Memorial?
This is the question
Identify the length, width, and height of the figure formed.
What does x=_____ degrees
Whoever runs this sight, do something about the f_cking scams. It ruins an entire question, because it is labeled "Answered".
Below is a passage from Anti-Federalist Paper #84 written by Brutus, "With equal truth it may be said, that all the powers which the bills of rights guard again