JaymezMerfy1002 JaymezMerfy1002
  • 01-10-2018
  • Computers and Technology
contestada

Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

If 2/5 of a number is added to 1/3 of the same number ,the sum is 22. What is the number?
explain in steps how to graph this linear inequality 2x+3y > -2
If 2/5 of a number is added to 1/3 of the same number ,the sum is 22. What is the number?
What was the major purpose of the Truman Doctrine?
What's the word for to talk on and on pointlessly, without clear direction
How do we use the Pythagoras theorem in "everyday life".
What's the other term for: one who overindulges in food and drink
write a system of equations and solvea class of 195 students went on a field trip. They took 7 vehicles,some cars and some buses. find the number of cars and nu
which designer started as a fashion illustrator before focusing on industrial design?
What's the word for to talk on and on pointlessly, without clear direction